Presently, we send entire files to the Cloud (Google Cloud Storage) to be imported into BigQuery and do a simple drop/replace. However, as the file sizes have grown, our network team doesn't particularly like the bandwidth we are taking while other ETLs are also trying to run. As a result, we are looking into sending up changed/deleted rows only.
Trying to find the path/help docs on how to do this. Scope - I will start with a simple example. We have a large table with 300 million records. Rather than sending 300 million records every night, send over X million that have changed/deleted. I then need to incorporate the change/deleted records into the BigQuery tables.
We presently use Node JS to move from Storage to BigQuery and Python via Composer to schedule native table updates in BigQuery.
Hope to get pointed in the right direction for how to start down this path.
Stream the full row on every update to BigQuery.
Let the table accommodate multiple rows for the same primary entity.
Write a view eg table_last that picks the most recent row.
This way you have all your queries near-realtime on real data.
You can deduplicate occasionally the table by running a query that rewrites self table with latest row only.
Another approach is if you have 1 final table, and 1 table which you stream into, and have a MERGE statement that runs scheduled every X minutes to write the updates from streamed table to final table.
Related
I'm working on an ETL with Apache Beam and Dataflow using Python and I'm using BigQuery as a database/datawarehouse.
The ETL basically performs some processing then updates data that is already in BigQuery. Since there is no update transform in Apache Beam, I had to use the BigQuery SDK and write my own UPDATE query, and map it to each row.
The queries work fine when done sequentially, but when I use multiple workers, I get the following error:
{'reason': 'invalidQuery', 'message': 'Could not serialize access to table my_table due to concurrent update'}
I made sure that the same row is never accessed/updated concurrently (a row is basically an id, and each id is unique), I've also tried to run the same code with a simple Python script without Beam/Dataflow, and I still got the same error when I started using multiple threads instead of one.
Has anyone got the same problem using BigQuery SDK ? And do you have any suggestions to avoid that problem ?
I think it's better from your Beam Dataflow job to append the data.
Bigquery is more append oriented and the BigueryIO in Beam is adapted for append operation.
If you have an orchestrator like Cloud Composer/Airflow or Cloud Workflows, you can deduplicate the data in batch mode with the following steps :
Create a staging and final tables
Your orchestrator truncates your staging table
Your orchestrator runs your Dataflow job
Dataflow job reads your data
Dataflow job writes the result in append mode to Bigquery in the staging table
Your orchestrator run a task with a merge query with Bigquery between the staging and final tables. The merge query allows to insert or update the line in the final table if the element exists.
https://cloud.google.com/bigquery/docs/reference/standard-sql/dml-syntax?hl=en#merge_statement
Example of a merge query :
MERGE dataset.Inventory T
USING dataset.NewArrivals S
ON T.product = S.product
WHEN MATCHED THEN
UPDATE SET quantity = T.quantity + S.quantity
WHEN NOT MATCHED THEN
INSERT (product, quantity) VALUES(product, quantity)
I had a use case where I had a BQ table that was containing around 150K records, and I needed to update its content monthly (which means around 100K UPDATE and couple of thousands APPEND.
When I designed my Beam/Dataflow job to update the records with the BQ python API library, I fall in Quota issues (limited number of updated) as well as the concurrency issue.
I had to change the approach my pipeline was working with, from reading the BQ table and updating the record, to process the BQ table, update what needs to be updated, and append what's new, and save to a new BQ table.
Once the job is successfully finished with no error, you can replace the old one with the new created table.
GCP mentions:
Running two mutating DML statements concurrently against a table will
succeed as long as the two statements don’t modify data in the same
partition. Two jobs that try to mutate the same partition may
sometimes experience concurrent update failures.
And then :
BigQuery now handles such failures automatically. To do this, BigQuery
will restart the job.
Can this retry mechanism be a solution at all ? Anyone to elaborate on this?
Source: https://cloud.google.com/blog/products/data-analytics/dml-without-limits-now-in-bigquery
I am trying to read XML file(s) in Python, parse them, extract required fields and insert the extracted data into a Postgres table. I am new to Python and Postgres. So was hoping if someone could please clarify some questions I have in my mind.
The requirement is that there will be 2 target tables in Postgres for every XML file (of a certain business entity e.g. customers, product etc) that should be received and read on a particular day - CURRENT and HISTORY.
The CURRENT table (e.g. CUST_CURR) is supposed to hold the latest data received for a particular run (current day file) on that particular day and HISTORY table (CUST_HIST) will contain the history of all the data received till the previous run - i.e just keep on appending the records for every run into the HIST table.
However, the requirement is to make the HIST table a PARTITIONED table (to improve query response time by partition-pruning) based on the current process run date. In other words, during a particular run, the CURR table needs to be truncated and loaded with the day's extracted records, and the records already existing in the CURR table should be copied/inserted/appended into the HIST table in a NEW Partition (of the HIST table) based on the run date.
Now, when I searched the internet to know more about Postgres PARTITION-ing tables, it appears that to create NEW partitions, new tables need to be created manually (with a different name) every time representing that partition documentation?? The example shows a CREATE TABLE statement for creating a partition!!
CREATE TABLE CUSTOMER_HIST_20220630 PARTITION OF CUST_CURRENT
FOR VALUES FROM ('2006-02-01') TO ('2006-03-01')
I am sure I have misinterpreted this but can anyone please correct me and help me clear the confusion.
So if anyone has to query the HIST table with the run-date filter (assuming that the partitions are created on the run_date column), the user has to query that particular (sub)table (something like SELECT * FROM CUST_HIST_20220630 WHERE run_dt >= '2022-05-31') instead of the main partitioned table (SELECT * FROM CUSTOMER_HIST) ?
In other RDBMS's (Oracle, Teradata etc) the partitions are created automatically when the data is loaded and they remain part of the same table. When a user queries the table based on the partitioned column, the DB optimizer engine understands this and effectively prunes the unnecessary partitions and reads only the required partition(s), thereby highly increasing response time.
Request someone to please clear my confusion. Is there a way to automate partition creation while loading data to Postgres table by using Python (psycopg2) ? I am new to Postgres and Python so please forgive my naivety.
Background:
I have multiple asset tables stored in a redshift database for each city, 8 cities in total. These asset tables display status updates on an hourly basis. 8 SQL tables and about 500 mil rows of data in a year.
(I also have access to the server that updates this data every minute.)
Example: One market can have 20k assets displaying 480k (20k*24 hrs) status updates a day.
These status updates are in a raw format and need to undergo a transformation process that is currently written in a SQL view. The end state is going into our BI tool (Tableau) for external stakeholders to look at.
Problem:
The current way the data is processed is slow and inefficient, and probably not realistic to run this job on an hourly basis in Tableau. The status transformation requires that I look back at 30 days of data, so I do need to look back at the history throughout the query.
Possible Solutions:
Here are some solutions that I think might work, I would like to get feedback on what makes the most sense in my situation.
Run a python script that looks at the most recent update and query the large history table 30 days as a cron job and send the result to a table in the redshift database.
Materialize the SQL view and run an incremental refresh every hour
Put the view in Tableau as a datasource and run an incremental refresh every hour
Please let me know how you would approach this problem. My knowledge is in SQL, limited Data Engineering experience, Tableau (Prep & Desktop) and scripting in Python or R.
So first things first - you say that the data processing is "slow and inefficient" and ask how to efficiently query a large database. First I'd look at how to improve this process. You indicate that the process is based on the past 30 days of data - is the large tables time sorted, vacuumed and analyzed? It is important to take maximum advantage of metadata when working with large tables. Make sure your where clauses are effective at eliminating fact table block - don't rely on dimension table where clauses to select the date range.
Next look at your distribution keys and how these are impacting the need for your critical query to move large amounts of data across the network. The internode network has the lowest bandwidth in a Redshift cluster and needlessly pushing lots of data across it will make things slow and inefficient. Using EVEN distribution can be a performance killer depending on your query pattern.
Now let me get to your question and let me paraphrase - "is it better to use summary tables, materialized views, or external storage (tableau datasource) to store summary data updated hourly?" All 3 work and each has its own pros and cons.
Summary tables are good because you can select the distribution of the data storage and if this data needs to be combined with other database tables it can be done most efficiently. However, there is more data management to be performed to keep this data up to data and in sync.
Materialized views are nice as there is a lot less management action to worry about - when the data changes, just refresh the view. The data is still in the database so is is easy to combine with other data tables but since you don't have control over storage of the data these action may not be the most efficient.
External storage is good in that the data is in your BI tool so if you need to refetch the results during the hour the data is local. However, it is not locked into your BI tool and far less efficient to combine with other database tables.
Summary data usually isn't that large so how it is stored isn't a huge concern and I'm a bit lazy so I'd go with a materialized view. Like I said at the beginning I'd first look at the "slow and inefficient" queries I'm running every hour first.
Hope this helps
I have a aggregated data table in bigquery that has millions of rows. This table is growing everyday.
I need a way to get 1 row from this aggregate table in milliseconds to append data in real time event.
What is the best way to tackle this problem?
BigQuery is not build to respond in miliseconds, so you need an other solution in between. It is perfectly fine to use BigQuery to do the large aggregration calculation. But you should never serve directly from BQ where response time is an issue of miliseconds.
Also be aware, that, if this is an web application for example, many reloads of a page, could cost you lots of money.. as you pay per Query.
There are many architectual solution to fix such issues, but what you should use is hard to tell without any project context and objectives.
For realtime data we often use PubSub to connect somewhere in between, but that might be an issue if the (near) realtime demand is an aggregrate.
You could also use materialized views concept, by exporting the aggregrated data to a sub component. For example cloud storage -> pubsub , or a SQL Instance / Memory store.. or any other kind of microservice.
I have a table in Google BigQuery(GBQ) with almost 3 million records(rows) so-far that were created based on data coming from MySQL db every day. This data inserted in GBQ table using Python pandas data frame(.to_gbq()).
What is the optimal way to sync changes from MySQL to GBQ, in this direction, with python.
Several different ways to import data from MySQL to BigQuery that might suit your needs are described in this article. For example Binlog replication:
This approach (sometimes referred to as change data capture - CDC) utilizes MySQL’s binlog. MySQL’s binlog keeps an ordered log of every DELETE, INSERT, and UPDATE operation, as well as Data Definition Language (DDL) data that was performed by the database. After an initial dump of the current state of the MySQL database, the binlog changes are continuously streamed and loaded into Google BigQuery.